January 2016 - wire on the treads

2nd January

We filled 37 bags with chipped brash...

3rd January

... another 11 bags filled, then all 48 stacked over the fence in the Top Strip and the unchipped brash from the same area moved too. 

4th January

John made a start on the shelter for Paul. (Please note we have already discovered we need more sheds.) Clare continued in her attempts to remove humps/molehills from the Meadow and excavate surplus stone from near the road wall. 

11th January

More work on pony shelter - frame now stable (pun intended) Clare would like it noted that while the photographs she took show John at work, she fixed every single board to the frame. Just saying.

12th - 28th January

Work continued on shelter to completion. Stumps cut in Top Strip. Stiles completed on new fencing at top of Crag; all stiles now have wire on the treads.

27th January

Chris visited with a drone camera and took footage of Liddells. Clare had a go at flying it - probably the most technologically advanced thing she has ever done.

29th - 30th January

Wildflower seeds collected locally last year, sown in pots/trays at home. 

Bags of bags

Kissing in fashion

From this...

to this...

to this...

to this