1st October
More work on wall repair (2).
2nd October
Wall repair (2) finished!
6th October
More path laid at west end of Top Strip.
7th and 9th October
Fencing added on top of Crag in readiness for sheep on Top Grazing.
10th October
Paul pulled his first log! Part of Meadow wall knocked down by local farm traffic - trailer came unhitched and crashed into the wall. Farmer very apologetic and set to repair it tomorrow.
13th October
Wall repaired.
17th October
71 sheep from local farmer John arrived to eat theirs hearts out on the Top Grazing.
18th October
Mike P helped John take down and log a Corsican pine in the Top Strip. He loved it and wants to do more!
20th October
Bill, horse logger and woodsman, came to help advise with Paul and logging.
24th October
Sox and Snippets, Exmoor ponies, arrived to graze the Wildflower Meadow.