1st September

After a long pause, Paul returns to log-hauling training.

4th September

More path maintenance in Top Strip. Logs sawn and stacked in log shed ready for 2018.

6th September

Paul hauls some more. More path maintenance.

7th September

Clare and John set the bees from the unviable hive free on the Meadow. The queen travels up to the Top Grazing clinging on to the back bumper of the Land Rover. Having failed to spot her inside the hive, at least Clare could see that she was indeed smaller and thinner than expected and therefore likely to have been a drone-laying queen. Yet more path maintenance and work on the roadway by the top gate.

13th-16th September

Still more path maintenance; strimming in the Top Strip.

Paul hauling in fine style

Refurbished path in the Top Strip

This miniature forest was growing on the old path chip

Getting ready for next winter

More path refurbishment

16th September

We say goodbye to Snippets who leaves for Tarset pastures. Paul goes to Codlaw for pony boot camp while we go walking.

22nd September

46 Guelder Rose planted as hedging in the Orchard.

25th September

William the pony arrives.

27th September

Would you believe more path maintenance? It's a long path.

28th September

Site prepared for Field Maple Mel has grown and donated. Juniper maintenance on Crag.

 

Juliet brings William

Guelder rose hedging in the Orchard